Check every sling before it takes the load
Every sling gets a look before every lift. On a vessel deck, in drydock or on a plant floor, you are the last check before the load goes up, and Signal Mutual says that inspection is your job. The Occupational Safety and Health Administration (OSHA) requires shipyard employers to inspect rigging gear before each shift and during use when needed. That is Title 29 of the Code of Federal Regulations (CFR), Part 1915.111. Defective gear comes out of service until it is repaired or replaced.
When Slings Get Inspected
- Before first use: confirm the sling is what was ordered, the tag is readable and nothing is damaged.
- Before each use: check the sling and all its fittings and attachments. Signal Mutual also says to look again during and after the lift.
- At least every 12 months: a competent person the employer designates does a thorough inspection. Heavy or severe use calls for shorter intervals.
- Every 3 months for chain slings in shipyards: a thorough inspection, with the month marked on the chain.
Sources: OSHA, 29 CFR 1915.111, Inspection; OSHA, 29 CFR 1915.112, Ropes, Chains and Slings; Signal Mutual, Focus on Safety: Sling Inspection Criteria, May 26, 2026
Take It Out of Service If You See
A missing or unreadable tag puts a sling out of service. So does a knot, because OSHA bars shortening a sling with knots. After that, look for the damage that goes with each type:
- Wire rope: ten broken wires spread through one rope lay, or broken wires bunched in one strand. The strand count is five under OSHA’s general industry standard and three under its marine terminals standard. Also kinks, crushing, birdcaging, heat damage, corrosion, outside wires worn to one third of their original size, and cracked or worn end fittings.
- Chain: cracked, bent, twisted or stretched links, nicks and gouges, heat damage, and field welds or weld splatter. OSHA also sets a stretch limit of 5 percent in a measured section and a minimum link size in its wear table.
- Hooks: a throat opened more than 15 percent, or a hook twisted more than 10 degrees.
- Synthetic web: cuts, tears, holes or snags, melted or charred spots, acid or caustic burns, broken or worn stitches, fraying, and stiff or brittle areas from sun or chemicals.
- Synthetic round: cover damage that shows the core, cut or broken core yarns, melted or glazed spots, and knots.
- Anything else that makes you doubt it. If you doubt it, pull it.
Sources: OSHA, 29 CFR 1910.184, Slings; OSHA, 29 CFR 1915.112, Ropes, Chains and Slings; OSHA, 29 CFR 1917.42, Miscellaneous Auxiliary Gear (marine terminals); Signal Mutual, Focus on Safety: Sling Inspection Criteria, May 26, 2026
Common Mistakes
- Guessing the capacity. The tag shows the working load limit for each hitch and angle. Read it every time.
- Skipping the padding. OSHA says slings must be padded or protected from the sharp edges of the load. A cut or torn sling comes out of service.
- Shock loading. OSHA prohibits it. Take the lift up smooth.
- Pulling a sling out from under a load. OSHA bars it while the load is resting on the sling.
Sources: OSHA, 29 CFR 1910.184, Slings; Signal Mutual, Focus on Safety: Sling Inspection Criteria, May 26, 2026
What You Can Do
- Read the tag first. If the tag is missing or unreadable, do not use the sling.
- Look over the whole sling before every use: body, stitching or core, links and fittings.
- Match the working load limit on the tag to your hitch and angle.
- Pad sharp edges, lift smooth and never pull a sling out from under a load.
- Stay out from under raised loads and out of any area where a load could fall or roll.
- If you find damage, do not use the sling.
- Tell both your onsite supervisor and your Ameri-Force manager, right away, about damaged gear or a lift that went wrong.
When in doubt, take it out.
Ameri-Force is committed to keeping our skilled tradespeople safe on every site, every shift.
Sources
OSHA, 29 CFR 1915.111, Inspection
OSHA, 29 CFR 1915.112, Ropes, Chains and Slings
OSHA, 29 CFR 1917.42, Miscellaneous Auxiliary Gear (marine terminals)
Signal Mutual, Focus on Safety: Sling Inspection Criteria, May 26, 2026 (member library; no public link)